About
2025 Windsor

Location
2025 Windsor

Client
Grumman Butkus Associates
Horn Design

Category
Industrial
Existing Structure

Services Provided
Structural Drawings

Project Overview
Perry & Associates provided multiple services over the years for this property. The first project’s design intent was to replace the windows and enlarge them with the principal structural task being to determine if the building is sufficient to sustain that modification. This project included a site visit and review of the existing drawings, as well as a visual reviewing of a limited sample of the interior columns and estimate their structural size. Later development included, the designing and re-designing of the elevated steel platform above the roof to accommodate different equipment positioned on the roof, and the designing of lintels for three rectangular openings through the existing masonry wall and designing steel roof supports for the four penetrations through the existing roof. 

Related projects

SunPower Solar Panel Pier Foundations

Location Chicago, IL  Client SunPower Corporation, Systems Category Industrial Energy...

506 N Des Plaines St

Location 506 N Des Plaines St, Chicago Client The Salvation...

Nicolas Senn Auditorium

Location Chicago, IL Client Chicago Public Schools Category Schools Existing...

5211 N Clark St

Location 5211 N Clark St, Chicago Client Swedish American Museum...

Kankakee Facility

Location Kankakee, IL Client IKO Midwest JH2B Nugent Construction Co...

American Airlines Emergency

Location O’Hare, Chicago, IL Client American Airlines Category Commercial Existing...